A PHouse replaces a construction project with a process — six steps, most of which happen indoors while your land stays exactly as you left it.

Dream & design
It starts with your land and a conversation. We choose the model together, place it on your lot (sun, view, access), pick finishes and options like decks and solar, and give you one itemized price — including delivery and setup, so there are no 'site surprises' later.
Permits & paperwork
Most placements need a municipal permit. We provide the drawings and specifications your building department asks for, and we'll tell you plainly if your lot's zoning has a wrinkle to solve first. Rural and cottage-country placements are often refreshingly simple.
We build it indoors
Your home is framed, insulated, wired, plumbed and finished inside our Scarborough facility over about 10–14 weeks. No rain delays, no frozen materials, no mud. You'll get photo updates as it comes together — most owners visit at least once to stand in their kitchen before it has an address.
Your lot gets ready
While we build, a small crew prepares your site: screw piles are installed (an afternoon, not an excavation), and water, septic and electrical connections are roughed in where services exist. Off-grid lots skip most of this — the Juniper brings its own.
Delivery day
The finished module travels by flatbed and is lifted onto its piles by crane or set by tilt-deck, depending on access. Two-module homes are joined and sealed on site. It's a spectacle — bring chairs and a camera.
Move in
Connections are made, every system is tested, and we walk the home with you. Most owners sleep in their PHouse within days of delivery. Then the only construction left is the deck furniture you assemble yourself, at your leisure, forever.
Before you fall for a lot
Access matters most
A flatbed and crane need a road they can travel and room to swing. Steep, narrow or very remote lots aren't automatically out — we've placed homes in surprising spots — but access is the first thing we assess, honestly and for free.
What you need on the lot
Ideally: a roughly level placement area, and a plan for water and waste (municipal, well + septic, or off-grid systems). If your lot has none of that yet, that's a normal starting point — we'll map the options and costs before you commit.
Timing, realistically
Design and permits: a few weeks, depending on your municipality. Build: about 10–14 weeks. Delivery and move-in: days. Most owners go from first call to first coffee on the deck within a single season.
Step one is a conversation
Send us your lot — an address, a listing link, or just photos — and we'll walk the six steps with your land in mind.